Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
logo Ranchi Pioneer

A unit of Enterprising Journalist LLP

logo Ranchi Pioneer

A unit of Enterprising Journalist LLP

  • Home
  • Jharkhand
  • Capital
  • Features
  • Our Contributors
  • Team
  • Contact Us

About This Site

This may be a good place to introduce yourself and your site or include some credits.

Recent Posts

  • SIT cracks Palamu murder case; one Held, two Absconding
  • Ranchi to host 2nd South Asian Throwball Championship
  • Statewide campaign against drug abuse launched
  • BSL organises Blood Donation Camp
  • CM launches ‘District Sandbox’ to accelerate health-tech innovations

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Find Us

Address
The Pioneer, 1st Floor, Tara Niketan, Right Behind Sushila Niketan (House of Gopal Sahu/Shiv Pd Sahu), Radium Road, Ranchi 834001

 

Mobile No:
92343 00233, ‎+91 651 796 9585

 

Email:

Editorial: ranchipioneer@gmail.com
Advt: ranchipioneeradvt@gmail.com

  • Home
  • Jharkhand
  • Capital
  • Features
  • Our Contributors
  • Team
  • Contact Us
Close

Search

Home/Jharkhand/Dhalbhumgarh Airport project gains momentum as phase-3 survey begins
Jharkhand

Dhalbhumgarh Airport project gains momentum as phase-3 survey begins

June 12, 2026

PNS                                             

Jamshedpur

Hopes for the long-awaited Dhalbhumgarh Airport project have received a fresh boost following the commencement of a Phase-3 survey at the proposed airport site. A joint team of officials from multiple departments conducted an extensive inspection of the airport premises on Wednesday, signaling significant progress towards the implementation of the project.

The survey was carried out jointly by officials from the Forest Department, the Defence Estates Office (Ranchi), and the Indian Air Force. During the exercise, representatives associated with the Ministry of Defence undertook a physical verification of the land and inspected the existing conditions on the ground.

Officials compared official records with the actual status of the site to assess the availability and condition of the land earmarked for the airport project.

According to available records, the Ministry of Defence has approximately 413 acres of land registered under the Dhalbhumgarh Airport premises. During the inspection, officials focused on land demarcation and physical verification to ensure that official records accurately reflect the present ground reality.

While officials refrained from disclosing the specific objective behind the survey, they indicated that detailed information would be made public only after the completion of the verification process.

The latest survey has sparked renewed optimism among residents and stakeholders in the region. The development comes after the Central Government granted approval for the Dhalbhumgarh airstrip, leading many to believe that the airport project is now moving towards a more advanced stage.

The presence of both central and state-level officials at the site has further strengthened expectations that the project could soon witness accelerated progress.

As part of the survey, officials also examined whether any encroachments, unauthorized structures, or temporary occupations existed on the Ministry of Defence land. The team reviewed the current security arrangements at the site and explored measures to further strengthen protection of the land in the future.

Officials believe that once the survey findings are compiled and submitted to the concerned departments, the groundwork for the next phase of the Dhalbhumgarh Airport project could move forward more rapidly. The survey is being viewed as a crucial step in resolving land-related issues and facilitating future infrastructure development linked to the proposed airport.

The renewed activity at the site has generated fresh expectations that the long-pending Dhalbhumgarh Airport project may finally be moving closer to reality.

Share on:
Author

Editor

Follow Me
Other Articles
Previous

Jharkhand’s cinematic triumph: ‘PM’s WIFE’ gains global attention

Next

Own your style: Why developing a personal fashion sense is your superpower

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

About This Site

This may be a good place to introduce yourself and your site or include some credits.

Recent Posts

  • SIT cracks Palamu murder case; one Held, two Absconding
  • Ranchi to host 2nd South Asian Throwball Championship
  • Statewide campaign against drug abuse launched
  • BSL organises Blood Donation Camp
  • CM launches ‘District Sandbox’ to accelerate health-tech innovations

Archives

  • June 2026 (262)
  • May 2026 (55)

Find Us

Address
The Pioneer, 1st Floor, Tara Niketan, Right Behind Sushila Niketan (House of Gopal Sahu/Shiv Pd Sahu), Radium Road, Ranchi 834001

Mobile No:
92343 00233, ‎+91 651 796 9585

Email:

Editorial: ranchipioneer@gmail.com
Advt: ranchipioneeradvt@gmail.com

2026 (C) RanchiPioneer.com | A unit of Enterprising Journalist LLP | Powered By DigiCrow